Site Visit ,New Project
The proposed development involves constructing a four-bedroom house spread over two floors. It will feature off-road parking spaces, private outdoor amenity areas, and general ancillary spaces, including secure cycle storage and a designated refuse area..
The proposed new dwelling will be created by subdividing the current Manderley house. Pedestrian and vehicular access to the new dwelling will be via the existing entrance and driveway that currently serve Manderley. This shared approach will lead to an enlargement of the existing driveway, resulting in two clearly identifiable and distinguishable front entrance and parking areas for each property.
The proposed new dwelling is positioned perpendicular to the Manderley property, creating a sense of intentional placement. Its location is thoughtfully aligned with the host dwelling rather than being arbitrarily chosen. This arrangement also enhances the sense of arrival and definition when approaching either property, as both entrance points are immediately visible upon exiting the narrow driveway.
Tender Documents work stage 4
Detailed construction drawings and schedules outlining the work have been completed, along with the engineer’s structural calculations and design. The project experienced a delay due to the need for additional information from the engineer regarding the ground investigation, which involved intrusive site investigations such as boreholes and trial pits with SPT testing
Site Progress
Project has Commenced, Removal of Trees, Ground Preparations 17th November 2023
29th November 2023
The foundation is designed to ensure optimal structural integrity through a two-step preparation process. Initially, additional reinforcement rebar is strategically integrated to enhance support for the building load, followed by the careful pouring of high-quality concrete to create a robust and durable foundation. This methodical approach guarantees a solid base, essential for the longevity and stability of any construction project.
Project Update:
Site Visit: 24/1/2024
This product showcases the remarkable transformation of a construction project, highlighting the successful site visit that marks a significant milestone in its development. The current phase includes the foundational brick laying on the ground floor, installation of underfloor heating, and integration of essential main services, all of which contribute to the project’s overall progress. As the project evolves from architectural drawings to tangible construction, anticipation builds for the next two months, promising further advancements and a clearer vision of the final outcome. This product encapsulates the journey of construction, emphasizing the meticulous attention to detail and the commitment to quality that defines this endeavour.
Site Visit: 21/6/2024
Construction Deadline
This project is set for completion in August 2024, promising a state-of-the-art facility that meets modern standards. For ongoing updates and insights into the development process, please follow our Instagram account, where we share the latest news and progress.